Personnel
The total number of the engineering and technical personnel involved in the projects of SALKO Engineering Group s.r.o. is 19 specialists, 6 of whom are permanently present at NPP working sites of the existing projects.
All specialists have higher technical education, improve their qualification level in the power engineering facility seismic stability area permanently, namely, perform seismic stability calculations of NPP equipment and pipelines by means of the critical seismic stability method and HCLPF critical seismic stability determination.
The Project Manager of SALKO EG s.r.o. is a member of composite authors of the Technical Report “Safety Improvement and Life Extension of the Power Units No. 1 and 2 of SS ‘Rivne NPP’. Final Report”. Published by Vipol CJSC, 2011.
The personnel of SALKO EG s.r.o. has no medical contraindications for execution of works within the ionizing radiation range. In order to be allowed for execution of works at power units the personnel, who directly takes part in equipment and pipeline seismic walkdowns, receives a medical examination annually.
The personnel of SALKO EG s.r.o. has practical skills of seismic stability assessment and seismic stability margin determination for SRS equipment and pipelines of NPP power units, which have been purchased when rendering services on seismic impact equipment qualification at the power unit No. 2 of SS “ZNPP”, the power units No. 2, 3 of SS “SUNPP” and the power units No. 1-4 of SS “RNPP” and seismic stability assessment of equipment and pipelines of the power units No. 1, 2 of SS “SUNPP” and the power units No. 1, 2 of SS “ZNPP”.
The company personnel improves qualification taking part in specialized conferences and seminars on NPP site seismic stability assessment and NPP and TPP pipeline strength calculation performance. The principal reporters at these seminars are: Doctor Paul Rizzo – President of Paul C. Rizzo Associates, Inc., John Stevenson – President of Stevenson Consulting, Viktor Kostarev – an expert and a member of IAEA ISSC Research Council, a member of ASME Nuclear Standards Committee.
Taking into account complexity and a specific character of the set tasks SALKO Engineering Group s.r.o. can involve specialists of partner organizations of Paul C. Rizzo Associates, Inc., CKTI-Vibroseism Ltd., UNIX CZ s.r.o. and LLC “Engineering Company “Atom-Energo-Proekt”.