Contract Subject |
Implementation |
Services for participation in performance of seismic strength and seismic stability margin calculations (SMA and GIP methods) of equipment of the power unit No.1 South-Ukraine NPP |
2013-2014 |
Services for participation in seismic impact equipment qualification at the power units No.2, 3 South-Ukraine NPP, including the calculation method. |
2013-2014 |
Determination of critical seismic stability of components of the power unit No.1 Zaporizhzhya NPP for the purposes of the probabilistic seismic hazard analysis (PSHA) development for the power unit No.1 ZNPP |
2014 |
Participation in seismic hazard curve plotting (average, complex and percentile) of peak ground acceleration (PGA) and uniform hazard response spectra (UHRS) for 1E-3 and 1E-4 annual mean exceedance frequency on the soil surface |
2015 |
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of a technical proposal on the project “Safety Justification of the Emergency Hydrogen Mitigation System for the Power Units No.1, 2 Zaporizhzhya NPP” |
2015 |
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of the “Preliminary Report on Calculation and Analytical Study of the Number and the Installation Sites of Passive Autocatalytic Hydrogen Recombiners (NIS PAR) at the Power Units No.3, 4 Rivne NPP and the Power Units No.1, 2 Khmelnitskyi NPP” |
2015 |
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of “Calculation and Analytical Study of the Number and the Installation Sites of Passive Autocatalytic Hydrogen Recombiners (NIS PAR) at the Power Units No.1, 2 Zaporizhzhya NPP” |
2015 |
Joint participation in seismic qualification of TME (technological machines and equipment), IRS (infrared spectroscopy) equipment and EE (electrical equipment) of the power unit No.2 Zaporizhzhya NPP |
2015-2016 |
Joint participation in seismic stability and seismic stability margin assessment of equipment of the power unit No.3 South-Ukraine NPP |
2016-2017 |
Design of project for carry out the capital improvement of excitation system of hydroturbine units No.1,2 of Tashlyk Hydro Pumped Storage Power Plant |
2017 |
Execution of a set of works on seismic impact equipment qualification at the power unit No.3 Rivne NPP |
2014-2017 |
Execution of a set of works on seismic impact equipment qualification at the power units No.1,2 Rivne NPP |
2014-2016 |
Performance of seismic stability and seismic stability margin assessment of equipment and pipelines of the power units No.1,2 Zaporizhzhya NPP |
2016-2017 |
Performance of seismic stability of the excitation system and the device of smooth frequency start-up |
2017 |
Joint participation in seismic stability assessment of equipment and pipelines of the power unit No.3 RNPP |
2015-2018 |
Performance of seismic stability additional valves of the power units No.1,2 ZNPP |
2017-2018 |
Seismic stability equipment assessment of additional system of auxiliary feed water of power units No. 1,2 of Rivne NPP to peak ground acceleration (PGA) 0,1g |
2017-2019 |
Assessment of seismic stability of Zaporizhzhya NPP Unit No. 5 TAMW (thermal automation and measurement workshop) equipment and its qualification for seismic impact |
2018-2019 |
Estimate documentation adjustment for carry out the capital improvement of excitation system of hydroturbine units No. 1, 2 of Tashlyk HPSPP |
2019 |
Development of design and construction documentation for the subsystem of the automated process control system (vibration monitoring) of the hydroelectric unit No. 4 of the Dniester PSPP |
2019-2020 |
Assessment of seismic resistance of equipment of the Rivne NPP units No. 1, 2 which was not included into the list of equipment related to fulfillment of critical safety functions and impulse pipelines of the Rivne NPP unit No. 4 |
2019-2020 |
Qualification of Zaporizhzhya NPP power unit 5 tanks, vessels and heat exchangers for seismic impacts |
2019-2020 |
Qualification of Zaporizhzhya NPP power unit 5 pump equipment for seismic impacts |
2019-2020 |
Assessment of seismic resistance of intermediate valves of SIS pipelines unit No. 3 South-Ukraine NPP |
2019-2020 |
Assessment of seismic resistance of intermediate valves of SIS pipelines units No. 1,2 South-Ukraine NPP |
2019-2020 |
Development of design and estimate documentation for the reconstruction of the microprocessor control unit for pump-turbine of hydraulic units st. No. 1,2 of Tashlyk PSP |
2020 |