References

References

Contract Subject Implementation
Services for participation in performance of seismic strength and seismic stability margin calculations (SMA and GIP methods) of equipment of the power unit No.1 South-Ukraine NPP 2013-2014
Services for participation in seismic impact equipment qualification at the power units No.2, 3 South-Ukraine NPP, including the calculation method. 2013-2014
Determination of critical seismic stability of components of the power unit No.1 Zaporizhzhya NPP for the purposes of the probabilistic seismic hazard analysis (PSHA) development for the power unit No.1 ZNPP 2014
Participation in seismic hazard curve plotting (average, complex and percentile) of peak ground acceleration (PGA) and uniform hazard response spectra (UHRS) for 1E-3 and 1E-4 annual mean exceedance frequency on the soil surface 2015
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of a technical proposal on the project “Safety Justification of the Emergency Hydrogen Mitigation System for the Power Units No.1, 2 Zaporizhzhya NPP” 2015
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of the “Preliminary Report on Calculation and Analytical Study of the Number and the Installation Sites of Passive Autocatalytic Hydrogen Recombiners (NIS PAR) at the Power Units No.3, 4 Rivne NPP and the Power Units No.1, 2 Khmelnitskyi NPP” 2015
Maintenance of Westinghouse Electric Germany Gmbh. Participation in preparation of “Calculation and Analytical Study of the Number and the Installation Sites of Passive Autocatalytic Hydrogen Recombiners (NIS PAR) at the Power Units No.1, 2 Zaporizhzhya NPP” 2015
Joint participation in seismic qualification of TME (technological machines and equipment), IRS (infrared spectroscopy) equipment and EE (electrical equipment) of the power unit No.2 Zaporizhzhya NPP 2015-2016
Joint participation in seismic stability and seismic stability margin assessment of equipment of the power unit No.3 South-Ukraine NPP 2016-2017
Design of project for carry out the capital improvement of excitation system of hydroturbine units No.1,2 of Tashlyk Hydro Pumped Storage Power Plant 2017
Execution of a set of works on seismic impact equipment qualification at the power unit No.3 Rivne NPP 2014-2017
Execution of a set of works on seismic impact equipment qualification at the power units No.1,2 Rivne NPP 2014-2016
Performance of seismic stability and seismic stability margin assessment of equipment and pipelines of the power units No.1,2 Zaporizhzhya NPP 2016-2017
Performance of seismic stability of the excitation system and the device of smooth frequency start-up 2017
Joint participation in seismic stability assessment of equipment and pipelines of the power unit No.3 RNPP 2015-2018
Performance of seismic stability additional valves of the power units No.1,2 ZNPP 2017-2018
Seismic stability equipment assessment of additional system of auxiliary feed water of power units No. 1,2 of Rivne NPP to peak ground acceleration (PGA) 0,1g 2017-2019
Assessment of seismic stability of Zaporizhzhya NPP Unit No. 5 TAMW (thermal automation and measurement workshop) equipment and its qualification for seismic impact 2018-2019
Estimate documentation adjustment for carry out the capital improvement of excitation system of hydroturbine units No. 1, 2 of Tashlyk HPSPP 2019
Development of design and construction documentation for the subsystem of the automated process control system (vibration monitoring) of the hydroelectric unit No. 4 of the Dniester PSPP 2019-2020
Assessment of seismic resistance of equipment of the Rivne NPP units No. 1, 2 which was not included into the list of equipment related to fulfillment of critical safety functions and impulse pipelines of the Rivne NPP unit No. 4 2019-2020
Qualification of Zaporizhzhya NPP power unit 5 tanks, vessels and heat exchangers for seismic impacts 2019-2020
Qualification of Zaporizhzhya NPP power unit 5 pump equipment for seismic impacts 2019-2020
Assessment of seismic resistance of intermediate valves of SIS pipelines unit No. 3 South-Ukraine NPP 2019-2020
Assessment of seismic resistance of intermediate valves of SIS pipelines units No. 1,2 South-Ukraine NPP 2019-2020
Development of design and estimate documentation for the reconstruction of the microprocessor control unit for pump-turbine of hydraulic units st. No. 1,2 of Tashlyk PSP 2020